Skip to main content

Glen Arden Inc: Medical Director Had No Nursing Home Experience - NY

Glen Arden Inc: Medical Director Had No Nursing Home Experience - NY
Healthcare Facility
Glen Arden Inc
Goshen, NY  ·  3/5 stars

That detail emerged during a follow-up inspection at the Goshen nursing home in early September 2024. When inspectors interviewed the administrator on September 4, she stated she had just met the new medical director that same day, more than two weeks after he had started. She could not provide information about how often he had visited the facility, how many hours he had logged, or what he had billed for resident visits since his hire date on August 1.

The medical director, for his part, had never worked in a skilled nursing facility before taking the job. He told inspectors he was not familiar with working with a geriatric population. He did not know the regulations governing medical director responsibilities. He had not spoken with the physician he was replacing before his start date, had not been introduced to staff, had not attended any staff meetings, and had not joined the facility's quality assurance committee.

He also did not see a single resident until August 12, twelve days after he began.

Glen Arden had no nurse practitioner and no physician assistant on staff. The new medical director was the only physician in the building.

The Medical Director Agreement, signed three days before his hire date, spelled out his obligations clearly: ensure that each resident's physician attends to their medical needs, participates in care planning, follows required visit schedules, and complies with facility policies and regulations. What inspectors found when they returned in September bore little resemblance to that agreement.

When the medical director did begin seeing residents, he did not document his assessments in the medical record. There were no notes from his visits.

The assistant administrator told inspectors she had provided the new medical director with contact information for his predecessor and encouraged them to speak before the transition. She never confirmed whether that conversation happened. She was also unsure who had actually approved the hiring decision.

The former administrator, who had conducted the original interview with the medical director, was no longer at the facility by the time inspectors returned. The new administrator, hired on August 19, was still learning who was running the medical side of the building when she sat down with inspectors on September 4.

The inspection that produced these findings was itself a revisit, conducted between September 3 and September 5, 2024, to check on deficiencies identified during an earlier survey. The violation was cited at a level of minimal harm or potential for actual harm, with some residents affected. The citation references a separate finding under F689, which covers accident hazards and supervision.

What the record shows is a facility that replaced its top physician with someone who had never navigated the specific demands of nursing home medicine, arranged no meaningful handoff between the outgoing and incoming doctors, hired a new administrator into the middle of that transition, and then left the new medical director to figure out his responsibilities largely on his own.

For nearly two weeks in August, the residents of Glen Arden, a population that by definition requires skilled nursing care, had a physician of record who had not examined them, was not writing in their charts, and did not know what the regulations required of him.

The assistant administrator said she encouraged the two physicians to connect. She never checked whether they did.

Full Inspection Report

The details above represent a summary of key findings. View the complete inspection report for Glen Arden Inc from 2024-07-02 including all violations, facility responses, and corrective action plans.

Additional Resources

Editorial Standards & Data Disclosure

Data source: This article is based on inspection data downloaded directly from the Centers for Medicare & Medicaid Services (CMS) via Medicare.gov. CMS releases inspection reports in bulk; we publish the findings as documented by state surveyors in the official Form CMS-2567 Statement of Deficiencies.

Plan of correction: The CMS report we receive does not include the facility's plan of correction. Facilities submit plans of correction separately to state survey agencies and those responses may not be reflected in CMS data at the time of publication. The absence of a plan of correction in our data does not mean one was not filed. Readers who want information about corrective steps taken are encouraged to contact the facility directly or their state survey agency.

Corrections may have occurred: Inspection reports reflect conditions observed on the date of the survey. Facilities may have implemented corrections, staffing changes, additional training, or other remediation since the report was issued. We report what CMS provides and encourage readers to seek current information from the facility.

Editorial process: Inspection findings are extracted from CMS source documents and synthesized using AI, reviewed for factual accuracy against the original report by our editorial team.

Corrections: We strive for accuracy in everything we publish. If you believe any fact in this article is incorrect, please contact us with details, and we will review and correct it promptly.

Professional review: All content reviewed by Christopher F. Nesbitt, Sr., NH EMT & BU-trained Paralegal.

Last verified: November 23, 2026  ·  Our methodology

Quick Answer

Glen Arden Inc in Goshen, NY was cited for violations during a health inspection on July 2, 2024.

That detail emerged during a follow-up inspection at the Goshen nursing home in early September 2024.

Health inspections identify deficiencies that facilities must correct. Violations range from minor documentation issues to serious safety concerns. Review the full report below for specific details and facility response.

Frequently Asked Questions

What happened at Glen Arden Inc?
That detail emerged during a follow-up inspection at the Goshen nursing home in early September 2024.
How serious are these violations?
Violation severity varies from minor documentation issues to serious safety concerns. Review the inspection report for specific deficiency codes and scope. All violations must be corrected within required timeframes and are subject to follow-up verification inspections.
What should families do?
Families should: (1) Ask facility administration about specific corrective actions taken, (2) Request to see the follow-up inspection report verifying corrections, (3) Check if this represents a pattern by reviewing prior inspection reports, (4) Compare this facility's ratings with other nursing homes in Goshen, NY, (5) Report any new concerns directly to state authorities.
Where can I see the full inspection report?
The complete inspection report is available on Medicare.gov's Care Compare website (www.medicare.gov/care-compare). You can also request a copy directly from Glen Arden Inc or from the state Department of Health. The report includes specific deficiency codes, facility responses, and correction timelines. This facility's federal provider number is 335802.
Has this facility had violations before?
To check Glen Arden Inc's history, visit Medicare.gov's Care Compare and review their inspection history, quality ratings, and staffing levels. Look for patterns of repeated violations, especially in critical areas like abuse prevention, medication management, infection control, and resident safety.

Facility Details
Name Glen Arden Inc
Location Goshen, NY
CMS Rating 3 / 5
Beds 40

Advertisement

Ergonomic memory foam pillow

Losing sleep over a loved one's care?

The Derila Ergo memory foam pillow supports your neck in any sleep position. 60-day return policy.

See the Derila Pillow