Liberty Center For Rehabilitation And Nursing
LIBERTY CENTER FOR REHABILITATION AND NURSING in PHILADELPHIA, PA — inspection on April 28, 2026.
Found 1 citation. Severity: Standard violations.
Health inspections identify deficiencies that facilities must correct within required timeframes. Violations range from minor documentation issues to serious safety concerns and are subject to follow-up verification.
Inspection Findings
Observation of the resident shower room on the B unit revealed that the tub was soiled with dirt and debris and that there were missing tiles around the faucet for the tub.
Interview on April 28, 2026, at 10:23 a.m.
Resident R3 stated that the grab bar next to the toilet was loose.
Observation, at the time of the interview, confirmed that the grab bar between the toilet and sink in the bathroom for room C2 was loose and unstable.
Continued observation revealed that the handrail in the corridor by room C2 was loose and falling away from the wall with exposed screws.
Continued observation revealed that the bathroom in room C7 had broken floor tiles.
The bedside tray table for the resident in room C7 bed 2 had a section of the tray that was peeled away.
Further observation revealed that in room D17 the dresser was missing a drawer, with the resident's personal items falling from the cavity; the closet was missing a handle knob, the bathroom sink was covered in corrosion, the bathroom also had a broken towel rack and broken tiles below the sink. A tour was conducted with the Nursing Home Administrator and Director of Nursing on April 28, 2026, at 10:40 a.m. and the above areas were reviewed. 28 Pa Code 201.14(a) Responsibility of licensee28 Pa Code 204.12 Toilet room equipment28 Pa Code 205.9(a) Corridors28 Pa Code 205.67(j) Electrical requirements for existing construction Any deficiency statement ending with an asterisk (*) denotes a deficiency which the institution may be excused from correcting providing it is determined that other safeguards provide sufficient protection to the patients. (See instructions.) Except for nursing homes, the findings stated above are disclosable 90 days following the date of survey whether or not a plan of correction is provided.
For nursing homes, the above findings and plans of correction are disclosable 14 days following the date these documents are made available to the facility. If deficiencies are cited, an approved plan of correction is requisite to continued program participation.
LABORATORY DIRECTOR'S OR PROVIDER/SUPPLIER TITLE (X6) DATE REPRESENTATIVE'S SIGNATURE
Frequently Asked Questions
More Reports
Source: This inspection report was downloaded directly from the Centers for Medicare & Medicaid Services (CMS) via Medicare.gov. CMS releases nursing home inspection reports in bulk. The findings reflect what state surveyors documented in the official Form CMS-2567 Statement of Deficiencies on the date of the inspection.
Plan of correction not included: The CMS report we receive does not include the facility's plan of correction. Facilities submit plans of correction separately to their state survey agency and those responses may not appear in CMS public data at the time of release. The absence of a plan of correction in this report does not mean one was not filed. Readers who want information about corrective steps taken by the facility are encouraged to contact the facility or their state survey agency directly.
Corrections may have been made: This report reflects conditions observed on the date of the survey. The facility may have implemented staffing changes, additional training, policy revisions, or other corrective actions since this report was issued. We publish what CMS provides and encourage readers to seek current information from the facility.