Lindengrove Menomonee Falls: Care Plan Gap Found - WI
What they did not do was write a care plan.
Advertisement
Losing sleep over a loved one's care?
The Derila Ergo memory foam pillow supports your neck in any sleep position. 60-day return policy.
See the Derila PillowThe resident, identified in inspection records only as R297, was a man living with diabetes, dementia, depression, a documented pressure ulcer, limited mobility, and a high fall risk. His chart contained 17 separate care plans covering conditions from constipation to antidepressant use to his wish to remain at the facility long-term. When his catheter went in, a care plan was written for it. When the catheter came out, and his bladder showed early signs of struggle, no one wrote a plan for what came next.
Federal inspectors documented the gap during a March 3, 2025 survey.
A nurse's note from June 8, 2024, written by a registered nurse, recorded the post-void residual of 396, the hematuria, and the fluid encouragement. R297's blood sugar that morning was 84; by noon it had climbed to 170. He refused insulin, telling staff he felt fine. Four days later, on June 12, a licensed practical nurse noted he was voiding without difficulty, denied pain, and appeared alert and oriented. Staff would continue to monitor, the note said.
The monitoring continued. The care plan did not arrive.
When the surveyor raised the issue with the Director of Nursing, identified as DON-B, on February 18, 2025, the conversation was short. The director confirmed that nursing, MDS coordinators, therapy, social services, and dietary staff all participate in the care planning process. She confirmed that yes, a urinary continence care plan should be developed after a catheter is removed. When the surveyor asked why that hadn't happened for R297, she said she didn't know.
The surveyor pressed further, asking who should have written the plan. Nursing management or MDS, DON-B said. Not the floor nurse.
No one provided any further explanation.
The inspection classified the violation as causing minimal harm or potential for actual harm, and noted it affected few residents. The finding fell under the federal requirement that facilities develop and keep current a comprehensive care plan for each resident.
The gap in R297's care plan record is not a paperwork dispute. A post-void residual of 396 milliliters, combined with blood in the urine, in a man with dementia who cannot reliably communicate discomfort, is the kind of clinical moment that a care plan exists to track. A care plan names the problem, assigns responsibility, sets a monitoring schedule, and gives the next nurse on the next shift a documented framework for what to watch. Without one, each shift starts from scratch.
R297's chart showed a facility that had been thorough about almost everything else. Staff had written care plans for his skin, his falls risk, his bowel function, his cognition, his mood. They had documented his advanced directives and his preference to stay at the facility. The catheter itself had a care plan. Seventeen plans in total, some initiated within days of his admission, others revised as his condition changed.
The one that should have been written when the catheter came out was never there.
The Director of Nursing told the inspector that floor nurses would not have been the ones to write it. That responsibility belonged to nursing management or MDS. The inspection record contains no explanation from either of those parties. No one identified a breakdown in the handoff. No one described what process, if any, was in place to flag catheter removals for follow-up care planning.
R297 appeared, by the nursing notes, to have recovered without incident. He was voiding. He denied pain. The hematuria resolved from the record without further mention.
What the record does not show is anyone being accountable for the plan that was never written, or any assurance that the next resident whose catheter comes out will fare as well.
Full Inspection Report
The details above represent a summary of key findings. View the complete inspection report for Lindengrove Menomonee Falls from 2025-03-03 including all violations, facility responses, and corrective action plans.
Additional Resources
Data source: This article is based on inspection data downloaded directly from the Centers for Medicare & Medicaid Services (CMS) via Medicare.gov. CMS releases inspection reports in bulk; we publish the findings as documented by state surveyors in the official Form CMS-2567 Statement of Deficiencies.
Plan of correction: The CMS report we receive does not include the facility's plan of correction. Facilities submit plans of correction separately to state survey agencies and those responses may not be reflected in CMS data at the time of publication. The absence of a plan of correction in our data does not mean one was not filed. Readers who want information about corrective steps taken are encouraged to contact the facility directly or their state survey agency.
Corrections may have occurred: Inspection reports reflect conditions observed on the date of the survey. Facilities may have implemented corrections, staffing changes, additional training, or other remediation since the report was issued. We report what CMS provides and encourage readers to seek current information from the facility.
Editorial process: Inspection findings are extracted from CMS source documents and synthesized using AI, reviewed for factual accuracy against the original report by our editorial team.
Corrections: We strive for accuracy in everything we publish. If you believe any fact in this article is incorrect, please contact us with details, and we will review and correct it promptly.
Professional review: All content reviewed by Christopher F. Nesbitt, Sr., NH EMT & BU-trained Paralegal.
Last verified: November 16, 2026 · Our methodology
Lindengrove Menomonee Falls in MENOMONEE FALLS, WI was cited for violations during a health inspection on March 3, 2025.
What they did not do was write a care plan.
Health inspections identify deficiencies that facilities must correct. Violations range from minor documentation issues to serious safety concerns. Review the full report below for specific details and facility response.