The resident, identified in inspection records as Resident 8, was readmitted to the facility in June 2024 after suffering an ischemic stroke. The stroke left the resident with hemiplegia and hemiparesis, partial paralysis affecting one side of the body. The resident also had acute and chronic respiratory failure and type 2 diabetes. By November 2024, an assessment found the resident severely impaired in cognitive skills and entirely dependent on staff for toileting, hygiene, dressing, and bathing.
Resident 8 received five medications through a G-tube, a feeding tube that delivers substances directly into the stomach. The medications included two separate anti-seizure drugs, two blood pressure medications, and a stool softener. Delivering them through a G-tube requires flushing the tube with water between each medication to prevent clogging and to allow each drug to absorb properly before the next one follows.
At 8:48 a.m. on the morning inspectors were present, a licensed vocational nurse identified as LVN 2 administered all five medications. The nurse flushed the tube after the first medication. Then stopped. The second, third, and fourth medications went in back to back, with no water between them. Only before the fifth medication did the nurse flush again.
Three consecutive medications administered without the required flush between them.
The director of nursing, when interviewed that same day, was direct about why the step matters. Flushing between medications, the DON said, helps with medication absorption and keeps the G-tube from clogging. The facility's own written procedure, last revised in November 2018, requires 15 milliliters of warm purified water between each medication when more than one is being given.
The nurse skipped that step for three of the five.
For a resident who cannot communicate cognitive distress, cannot reposition, and depends entirely on staff for every aspect of daily care, the consequences of a clogged G-tube or improperly absorbed medication are not theoretical. Clonazepam and levetiracetam, both prescribed to control seizures, require consistent delivery to maintain therapeutic levels. Metoprolol and lisinopril manage blood pressure. If either seizure medication fails to absorb correctly because it was stacked behind another drug without a flush, the gap between what the physician ordered and what the resident's body received widens in ways that aren't visible until something goes wrong.
Inspectors classified the violation as having the potential for more than minimal harm.
The facility is located at 250 West Artesia Street in Pomona. The inspection was part of a standard health survey. The deficiency was documented on a form that noted the facility's plan of correction could be obtained by contacting the nursing home or the state survey agency directly.
What the record does not show is whether anyone reviewed Resident 8's medication administration history to determine how often the flushes had been skipped before an inspector happened to be watching.
Full Inspection Report
The details above represent a summary of key findings. View the complete inspection report for Inland Valley Care and Rehabilitation Center from 2025-02-25 including all violations, facility responses, and corrective action plans.
Additional Resources
Data source: This article is based on inspection data downloaded directly from the Centers for Medicare & Medicaid Services (CMS) via Medicare.gov. CMS releases inspection reports in bulk; we publish the findings as documented by state surveyors in the official Form CMS-2567 Statement of Deficiencies.
Plan of correction: The CMS report we receive does not include the facility's plan of correction. Facilities submit plans of correction separately to state survey agencies and those responses may not be reflected in CMS data at the time of publication. The absence of a plan of correction in our data does not mean one was not filed. Readers who want information about corrective steps taken are encouraged to contact the facility directly or their state survey agency.
Corrections may have occurred: Inspection reports reflect conditions observed on the date of the survey. Facilities may have implemented corrections, staffing changes, additional training, or other remediation since the report was issued. We report what CMS provides and encourage readers to seek current information from the facility.
Editorial process: Inspection findings are extracted from CMS source documents and synthesized using AI, reviewed for factual accuracy against the original report by our editorial team.
Corrections: We strive for accuracy in everything we publish. If you believe any fact in this article is incorrect, please contact us with details, and we will review and correct it promptly.
Professional review: All content reviewed by Christopher F. Nesbitt, Sr., NH EMT & BU-trained Paralegal.
Last verified: November 23, 2026 · Our methodology
INLAND VALLEY CARE AND REHABILITATION CENTER in POMONA, CA was cited for violations during a health inspection on February 25, 2025.
The resident, identified in inspection records as Resident 8, was readmitted to the facility in June 2024 after suffering an ischemic stroke.
Health inspections identify deficiencies that facilities must correct. Violations range from minor documentation issues to serious safety concerns. Review the full report below for specific details and facility response.