Dawson Health and Rehab: PASRR Screening Failure - GA
Federal inspectors found the discrepancy on February 6, 2025.
The resident, identified in inspection records only as Resident 40, had been admitted to the facility on a date the report does not specify. What the report does specify is that from November 2023 through February 2025, the Social Services Director completed six separate Comprehensive Social Assessments. Each one omitted any mention of schizophrenia or intellectual disability. Each one was signed by the same director. Each one said, in the mental development section, that there was no history of mental illness.
The diagnoses were sitting in the same electronic medical record the entire time.
The gap mattered because federal rules require nursing homes to ensure residents with serious mental illness or intellectual disabilities are screened before or shortly after admission, a process called Preadmission Screening and Resident Review, or PASRR. The screening exists specifically to determine whether a resident needs specialized services that a standard nursing facility may not provide. A Level I screen is meant to flag whether a Level II evaluation, the deeper assessment, is warranted.
Resident 40 had never received either one.
When inspectors asked about the missing screenings, the Social Services Director produced a Level I form that the hospital had completed before admission, dated October 23, 2023. On that form, someone had checked "No" to the question of whether the resident had a primary diagnosis of serious mental illness, developmental disability, or a related condition. The director told inspectors the hospital had filled it out incorrectly, and that because the Level I came back negative, no Level II was ever triggered.
The director said she was not aware Resident 40 had a mild intellectual disability diagnosis.
She said she would update the application and submit it to the PASRR company.
When inspectors asked what policy the facility followed for PASRR screenings, the director handed them an undated document titled "Best Practice for PASRR." The facility, she said, had no actual policy. The best practice document stated that PASRR status should be reviewed for all new admissions, that the social services director should maintain an active and current list of PASRR patients, and that the list should include each patient's name along with whether they had a mental illness or intellectual or developmental disability and whether they required specialized services.
There was no such list.
The inspection report rated the violation as causing minimal harm or the potential for actual harm, and it affected few residents. Only one resident was reviewed for PASRR compliance out of a total sample of 19.
That framing, minimal harm, does not capture what the failure meant in practice. A resident with schizophrenia and intellectual disabilities spent more than a year in a nursing facility without anyone formally determining whether the facility was equipped to meet his mental health needs, or whether he should have been receiving specialized services he was not getting. The process designed to answer that question was bypassed at admission and never corrected, not after the first assessment, not after the second, not after the third, fourth, fifth, or sixth.
The Social Services Director, the person responsible for catching exactly this kind of gap, had written the words "no history of mental illness" so many times that by the time inspectors arrived, she did not know the diagnosis existed.
Resident 40 remained at the facility.
Full Inspection Report
The details above represent a summary of key findings. View the complete inspection report for Dawson Health and Rehabilitation from 2025-02-06 including all violations, facility responses, and corrective action plans.
Additional Resources
Data source: This article is based on inspection data downloaded directly from the Centers for Medicare & Medicaid Services (CMS) via Medicare.gov. CMS releases inspection reports in bulk; we publish the findings as documented by state surveyors in the official Form CMS-2567 Statement of Deficiencies.
Plan of correction: The CMS report we receive does not include the facility's plan of correction. Facilities submit plans of correction separately to state survey agencies and those responses may not be reflected in CMS data at the time of publication. The absence of a plan of correction in our data does not mean one was not filed. Readers who want information about corrective steps taken are encouraged to contact the facility directly or their state survey agency.
Corrections may have occurred: Inspection reports reflect conditions observed on the date of the survey. Facilities may have implemented corrections, staffing changes, additional training, or other remediation since the report was issued. We report what CMS provides and encourage readers to seek current information from the facility.
Editorial process: Inspection findings are extracted from CMS source documents and synthesized using AI, reviewed for factual accuracy against the original report by our editorial team.
Corrections: We strive for accuracy in everything we publish. If you believe any fact in this article is incorrect, please contact us with details, and we will review and correct it promptly.
Professional review: All content reviewed by Christopher F. Nesbitt, Sr., NH EMT & BU-trained Paralegal.
Last verified: November 19, 2026 · Our methodology
DAWSON HEALTH AND REHABILITATION in DAWSON, GA was cited for violations during a health inspection on February 6, 2025.
Federal inspectors found the discrepancy on February 6, 2025.
Health inspections identify deficiencies that facilities must correct. Violations range from minor documentation issues to serious safety concerns. Review the full report below for specific details and facility response.